Why my 5th link-building post is a little late
April 14, 2009 by ian
Why, you may ask?
Let me tell you why.
It all starts with the Seattle Parks Department.
See, once a year they come by our office, which is backed up against a very nice greenspace, with this huge weedwhacker machine that looks like a Terminator nightmare. They turn it on (pushing it with a full-sized tractor, by the way) and it goes bzzzzzzzzzz, chopping down all that pesky green stuff.
This year, it threw a small rock through one of the windows in my office. I wasn't there at the time but near as I can tell it was going about 186,000 miles/second. It left a small hole in the window.
I reported this to our landlord.
5 weeks go by.
Then, with no notice, these guys show up to fix the window. They have a nice, shiny new piece of glass. Cool! Except apparently Neanderthal Man never saw one of these:

THIS IS A MEASURING TAPE, YOU NUBWITTED MISSING LINK. You use it to MEASURE STUFF. BEFORE YOU RIP OUT THE OLD WINDOW.
Alas, they yanked the old window and then realized that the glass they'd brought was the wrong size.
So they left my office open to the elements for a few hours, then came back and boarded up the window in fine zombie-apocalypse fashion. Which is to say it looks awful, provides no insulation and generally makes my office feel like I'm working in a war zone.
So yeah, I've been a tad distracted. No fear, though, part 5 in the link building series is going live tonight.




Join the Conversation:
Stuart Foster says:
April 15, 2009 07:16
You mean "guesstimation" isn't a real system of measurement? Crap. I know a lot of people who are beyond screwed.
Norman Flecha "STRAIGHTALK" says:
April 15, 2009 11:17
Cool theme but I got lost somewhere write me back.